1. SPEED of CONSTRUCTION
- In-house CAD technicians have the ability of building design and procurement of construction documents. Their ability to work directly with outside professionals such as Architects, Engineers and Mechanical staff reduces delays in the construction process..
- Concurrent Construction, meaning while our construction facility is constructing the modular portion of the building, on-site work is also being completed, such as grading, infield structure and foundations.
- Our 180,000 sq.ft. construction facility is equipped with construction jigs and ample material storage, which allows Mod-U-Kraf to perform construction tasks more efficiently and without delays.
- Mod-U-Kraf’s staff and facility supports outside subcontractors and construction components, which allows for a large percentage of work to be completed within the modular units prior to delivery.
2. COST CONTROL
- National Purchasing contracts allow for bulk buying. This reduces material costs dramatically thus allowing the realized savings to be passed along to the end user.
- Our 180,000 sq.ft. construction facility allows our crews to work no matter what the weather conditions dictate, thus eliminating work delays due to severe weather.
- Construction Times for projects are cut by two-thirds and drastically reduce construction interest and carrying costs.
- 70-80% of the building construction is under one contract and with our detailed check list, 99% of construction questions and spec clarifications are answered prior to the beginning of construction. This process dramatically cuts down or eliminates cost over-runs and change orders.
3. QUALITY of CONSTRUCTION
- With our in-house CAD technicians working together with Architects and Engineers, we prepare a complete and detailed set of construction documents. These documents are reviewed and approved by State and Third Party inspection teams.
- In-house Quality Control inspection teams review every step of the construction process.
- Independent Third Party inspection agencies inspect and approve all construction documents and construction work prior to delivery. All documents meet or exceed all building and fire safety codes.
- Name Brand product and construction materials, we pride ourselves in the process of Value Engineering to use the best-suited material to fit budget and performance ILO cutting corners.
4. SUSTAINABLE and LEED CONSTRUCTION
- 70 – 80% of the project is built in our construction facility, which means there is less impact on the local environment. This includes air quality and waste in local landfills.
- Our construction facilities geographical location allows us to purchase regional materials; this is a great benefit to LEED certified projects.
5. DESIGN FLEXIBILITY
- Over 40 years of modular construction experience allows our team the ability to meet the most difficult construction needs.
- Being creative with both construction materials and modular configuration allows for a successful project.
- The label “Special Project Division” is because we know all projects have special needs to meet the desires of the end user. Every project is unique and we have the ability work with their specific needs.
6. JOB-SITE IMPACT
- With 70 – 80% of the building constructed in our construction facility and typically only requiring 3-5 days for assembly, amount of construction area required for conventional construction gets reduced.
- With reduced construction time required to complete a building, this allows for off-season construction. This also means fewer interruptions for students as well as the school’s campus.
7. COMMUNITY IMPACT
- Although a large portion of the building is constructed off-site, we work with local sub-contractors for the completion of the project. This allows the colleges or universities to keep community involvement.